b'Additional building wrap with 75mm cover tohead flashing.Timber wall framing with wall insulation as all Selected fibre cement cladding as specified byspecified by Architect. Architect on 20mm H3.1 vertical battens to form150 upstandcavity. Fix in accordance with manufacturersBuilding wrap to return into louvre opening. recommendations.Provide flashing tape over wrap as per WANZwindow installation system. uPVC vent strip.Head trimmer or lintel as required to span 15mm drip edge to claddingopening. 5 20mm min cover to joinery40 x 25 x 3 fixing angle pop rivited to back of Inseal tape between joinery and flashing.frame @ 300mm c/c. Fix to platewith wood screws @ 300mm c/c. Purpose made aluminium head flashing with15 slope to extend 150mm behind cladding.Osbournes Model WPL50 (Flanged). Provide 20mm min cover to head of louvre withdrip edge and stop ends.Model WPL 50 (Flanged Frame)Typical Fibre Cement/Louvre Head Detail 01Osbournes LtdScale 1:5Selected fibre cement cladding as specified byArchitect on 20mm H3.1 vertical battens to formTimber wall framing with wall insulation as all cavity. Fix in accordance with manufacturersspecified by Architect. recommendations.Trimmer stud.Building wrap to return into louvre opening. 5 gap Sikaflex-20AT or similar approved sealant.Provide flashing tape over wrap as per WANZwindow installation system.45mm H3.1 treated packer to stop above sill Head flashing extends 50mm past flangetrimmer to allow sill flashing to finish hard 15mm min cover to claddingagainst trimmer stud.40 x 25 x 3 fixing angle pop rivited to back of 3108 Inseal tape 12mm thick x 10mm wide.frame @ 300mm c/c. Fix to plate with woodscrews @ 300mm c/c. Line of sill flashing under.Osbournes Model WPL50 (Flanged). Line of head flashing.Model WPL 50 (Flanged Frame)Typical Fibre Cement/Louvre Jamb Detail 02Osbournes LtdScale 1:5Page 4'